53 THE TRIPLE GLAZING ROOF WINDOWS
For the implementation of the hoppers, I have not followed the approach advocated EUROMAC2
That is to say, create the opening for the installation of roof panels Which shall have made win time!!!
For me it was the beginning of winter, it was essential to close the roof. Between the installation of panels, battens and roof tiles we arrived on December 23. The installation of velux was postponed until spring
Surprise us late May, winter is not set but the velux are installed!
The carpenter had pose the joist headers during the installation of the roof,
I cut out the opening with a saw and cut the z bars with grinder diameter 230 a little dangerous to redo saber saw with steel blade.
A word on the joist headers of the carpenter. It is a good idea support, creates a good base of roof panels. The implementation is simplified
Pour la mise en oeuvre des trémies, je n'ai pas suivi la méthode que préconise EUROMAC2
C'est à dire, créer l'ouverture pendant la pose des panneaux de toit qui m'aurai fait gagner du temps!!!
Pour ma part c'était le début de l'hiver, il fallait absolument fermer le toit. Entre la pose des panneaux, le lattage et la pose des tuiles nous étions arrivés au 23 décembre. La pose des velux était reportée au printemps. Surprise nous sommes la fin mai, l'hiver n'est pas partit mais les velux sont posés!!
Le charpentier m'avait posé les chevêtres pendant la pose du toit, il me restait juste à poser
le chevêtre du haut j'ai découpé l'ouverture avec la scie ci-dessous et coupé les barres en z avec une grande meuleuse diamètre 230 un peu dangereux, à refaire scie sabre avec lame acier.
Un mot sur les chevêtres du charpentier. C'est une bonne idée le support crée une bonne assise des panneaux après leurs découpes et les chevêtres servent à les visser. La mise en oeuvre en est simplifié même si vous la faites pendant la pose des panneaux de toit. Bien sûr les chevêtres sont apparents à l'intérieur.
La pose des velux, j'en ai rêvé et je l'appréhendais, c'était une première mais au final plus simple que je l'imaginais. Les croquis de pose sont bien expliqués et simples.
|
Lame de scie 30 cm |
|
chevêtre |
Why boards instead of slats? Because the z bars are not automatically above the joist headers.
A board 25 inches wide gives me a large margin. So I can screw the board on the hopper and the z-bar panel. The OSB3 panels that form the inner frame are screwed onto the joist headers and the velux frame.
Pourquoi les planches à la place des lattes? Car les barres en z ne sont pas automatiquement au-dessus des chevêtres. Une planche de 25 cm de large me donne une grande marge. Je peux ainsi visser la planche sur la trémie et sur la barre en z du panneau.
Les panneaux OSB3 qui forment le cadre intérieur sont vissés sur les chevêtres et le cadre du velux. Prendre soin que les vis ne dépassent pas le cadre.
|
Vis 8 x 300 mm pour le cadre de la trémie |
Here I drilled holes in the boards to fill the cavities between OSB3 and panels roof of foam. I kinda forced on foam! Then I removed the excess foam. Then I coated silicone around the boards osb and finish with a strip of foam to protect. Then I posed the BDX kit and the kit of the velux
For information, the windows is normally demount after setting the frame to finish the assembly without fear.
Triple glazing is very heavy this is why I left them! I protected with polystyrene panels during the time of the work. I'll finish with a vapor barrier on the interior.
Ici j'ai percé des trous dans les planches pour remplir de polyuréthane les cavités entre l'OSB3 et les panneaux. J'ai un peu forcé sur le polyuréthane!!
Ensuite j'ai enlevé le surplus de polyuréthane. Puis j'ai enduit du silicone tout autour des planches et sur le cadre d'OSB3 pour finir avec une bande de polyuréthane pour le protéger
Puis, j'ai posé le kit BDX et le kit d'habillage qui est fourni avec le velux
Pour info, normalement l'ouvrant s'enlève après le réglage du cadre pour finir le montage sans crainte. Le triple vitrage est très lourd c'est pour cela que je les ai laissé !! je l'ai protégé avec des panneaux de polystyrène pendant le temps des travaux. Je finirai avec un pare-vapeur sur le cadre intérieur.