mercredi 16 mai 2012

16 MONTAGE DU VIDE SANITAIRE

16 FITTING THE CRAWL SPACE

The establishment of the crawl space of 0.80m in height and 8m3 concrete
I have not bricked the first blocks. There are just resting on the foundations that need to be level. The little adjustment is made ​​with wooden wedges that I prepared and polyurethane foam to fill the void. Namely 1.20m shoring up the blocks is unnecessary, just increase the caps. When the blocks are assembled to form the perimeter of the house structure becomes very rigid and will not move during concrete pouring. If the blocks are moving is that you pour too fast. Another tip the concrete should certainly not be too liquid, it should be runny paste. Then made ​​the last day of training at euromac2. It is useful. ( observe the laying and pouring and everything will be fine )


La mise en place du vide sanitaire de 0.80m de hauteur et de 8m3 de béton
Je n'ai pas maçonné les premiers blocs. Il sont justes posés sur les fondations qui doivent être à niveaux. Le peu de réglage se fait avec des calles en bois que j'ai préparé et de la mousse polyuréthane pour combler le vide. A savoir jusqu'à 1.20m l'étayage des blocs est inutile, renforcer juste les bouchons. Quand les blocs sont tous assemblés et forme le périmètre de la maison la structure devient très rigide et ne bougera pas pendant le coulage du béton. Si les blocs bougent c'est que vous coulez trop vite. Un autre conseil le béton ne doit surtout pas être trop liquide, il doit être pâteux coulant. Puis le dernier faites la journée de formation chez euromac2. Elle est utile.  (respecter les consignes de pose et de coulage et tout ira pour le mieux)
















1 commentaire:

  1. mon adresse mail est matsab.bougle@sfr.Fr
    pour échanger sur votre projet car j'aimerai construire en euro mac 2 est vous avez l'air d'avoir tout maîtrisé.
    cordialement

    RépondreSupprimer

Remarque : Seul un membre de ce blog est autorisé à enregistrer un commentaire.